Processor (CPU)
CPU Name
Intel® Core™ i7-10875H CPU @ 2.30GHz
Threading
1 CPU - 8 Core - 16 Threads
Frequency
4187.32 MHz (42 * 99.7 MHz) - Uncore: 3888.2 MHz
Multiplier
Current: 42 / Min: 8 / Max: 51
Architecture
Comet Lake / Stepping: R0/R1 / Technology: 14 nm
CPUID / Ext.
6.5.2 / 6.A5
IA Extensions
MMX, SSE, SSE2, SSE3, SSSE3, SSE4.1, SSE4.2, EM64T, AES, AVX, AVX2, FMA3
Caches
L1D : 32 KB / L2 : 256 KB / L3 : 16384 KB
Caches Assoc.
L1D : 8-way / L2 : 4-way / L3 : 16-way
Microcode
Rev. 0xF8
TDP / Vcore
45 Watts / 1.212 Volts
Temperature
100 °C / 212 °F
Type
Retail (Stock Frequency : 2300 MHz)
Cores Frequencies
#00: 4187.3 MHz  #01: 4187.3 MHz  #02: 4187.3 MHz  #03: 4187.3 MHz 
#04: 4187.3 MHz  #05: 4187.3 MHz  #06: 4187.3 MHz  #07: 4187.3 MHz 
Motherboard
Model
Dell 00K2XV
Socket
Socket 1440 FCBGA
North Bridge
Intel Comet Lake rev 02
South Bridge
Intel WM490 rev 00
BIOS
Dell Inc. 1.28.0 (12/12/2023)
Memory (RAM)
Total Size
16384 MB
Type
Dual Channel (128 bit) DDR4-SDRAM
Frequency
1462.6 MHz (DDR4-2926) - Ratio 3:44
Timings
21-21-21-47-2 (tCAS-tRCD-tRP-tRAS-tCR)
Slot #1 Module
Samsung 8192 MB (DDR4-3200) - P/N: M471A1K43DB1-CWE
Slot #2 Module
Samsung 8192 MB (DDR4-3200) - P/N: M471A1K43DB1-CWE
Graphic Card (GPU)
GPU #1 Type
Intel(R) UHD Graphics (Comet Lake GT2)
GPU #1 Brand
Dell
GPU #1 VRAM
128 MB
GPU #2 Type
NVIDIA Quadro RTX 4000 @ 1560 MHz
GPU #2 Brand
Dell
GPU #2 VRAM
8192 MB @ 7001 MHz (Micron)
Storage (HDD/SSD)
Model #1 Name
Micron 2300 NVMe 1024GB (FW: 23000030)
Model #1 Capacity
953.9 GiB (~1020 GB)
Model #1 Type
Fixed - Bus: RAID (8)
Miscellaneous
Windows Version
Microsoft Windows 11 Professional (x64)
CPU-Z Version
2.20.2 (64 bit)